Home/Quality
Quality

Quality Management

Inspection plans, in-process & final inspection, rejects, rework and parameter tolerances.

First Pass Yield
98.1%
0.4%
Reject Rate
1.2%
0.2%
Rework
0.7%
Inspections Today
186
Standards & Plans:
Inspections & Audits:
Non-Conformance & Rework:
Inspection Parameters & Tolerances
Target specifications, upper/lower limits, and measurement tools
IDParameterTargetMinMaxUnitMethodResultActions
P-01Length120119.9120.1mmVernier Caliper
Pass
P-02Width4544.9245.08mmMicrometer
Pass
P-03Diameter1211.9812.02mmBore Gauge
Pass
P-04Surface Finish1.60.83.2Ra μmSurface Profilometer
Pass
P-05Weight480475485gElectronic Balance
Fail
P-06Hardness585562HRCRockwell Tester
Pass
P-07Visual Inspection000defectsVisual
Pass
P-08Color000ΔESpectrophotometer
Pass
P-09Thread Quality000Go/NoGoThread Gauge
Pass
P-10Hole Diameter87.988.02mmPin Gauge
Pass
P-11Burr Check000mmVisual + Feeler
Pass
P-12Flatness000.05mmDial Indicator
Pass